Laboratoire Léon Brillouin

UMR12 CEA-CNRS

Bât. 563 CEA Saclay

91191 Gif sur Yvette Cedex

France

llb-sec@cea.fr

LLB on IN6-Sharp at ILL

CAD view of the Sharp project at ILL

LLB is engaged in the upgrade of IN6 through a CRG contract of type A. This upgrade will mainly takes place during the 2019 shutdown of ILL, but LLB will already be in charge of the IN6 spectrometer at the next 2017 reactor cycle. Details of the upgrade could be find in the attached pdf file.

 

IN6 at the ILL

Last update : 10/04 2017 (2766)

 

Retour en haut